Kitchen remodeling with cabinets from our Spring Grove shop
We take on kitchen remodeling and kitchen renovation across McHenry, Lake, Kane, DuPage and Cook counties. We can run your whole kitchen remodel as your general contractor: one team and one schedule, from the first visit to the last piece of trim. Or, if your own contractor leads the job, we build and install the cabinets for it. Either way, the cabinets are made in our own shop, every door included.
Opened in 2022, backed by more than 30 years of building and installing cabinets.
- Built in our own shop in Spring Grove, IL
- Family owned
- Written 1-year workmanship warranty
- Insured and licensed where required

Who runs your kitchen remodel?
You choose. We can run the whole remodel for you, or we can build the cabinets for a contractor who runs it.
We run the whole remodel
We can run your whole kitchen remodel as your general contractor, with the countertops, plumbing and electrical on the same schedule as the cabinets. If the old kitchen has to come out, taking it out is part of your quote when you want it.
A remodel we run can also carry the new floor, the backsplash and the painting of the room on the same schedule.
Your contractor runs it, we build the kitchen
If a general contractor, a builder or an interior designer already leads your remodel, we build the cabinets from their drawings and fit them into their schedule. We install them, or their crew does.
Your written scope lists exactly what we take on, whichever way you choose.
| We run the whole remodel | Your contractor runs it | |
|---|---|---|
| Who leads the job | We do, as your general contractor | Your general contractor, builder or designer |
| Who you call | One team, from the first visit to the last trim piece | Your contractor; we talk with them about the cabinets |
| Drawings | We draw it with you in the design package | We build from their drawings, or draw the cabinets with you |
| Cabinets | Built in our Spring Grove shop and installed by us | Built in our Spring Grove shop; we install them or their crew does |
| Countertops, plumbing, electrical | On the same schedule as the cabinets | On your contractor's schedule |
How does a kitchen remodel work, step by step?
Eight steps, and nothing gets built until you have signed the drawings.
- The visit. You send the form or call, and we set up a visit after a short call about your ideas. Bring your ideas and photos to the first visit. We measure the room, hear what you want from it and answer your questions. A written estimate follows. If it fits your plans, we draw it with you until it's right, and only then do we build. On a remodel, tell us what you want to change in the room as well as the cabinets: a wall, a window, where the sink goes.
- The written estimate. After the visit we work through the numbers and send you a written estimate. It covers your scope line by line, so you can see what is in it and compare it with other proposals the same way.
- The design package and drawings. If the estimate fits your plans, the design package covers the detailed measuring and the drawings: a 2D layout, 3D renderings or both, with one major revision. It ends with the final price. If you move forward with Da Vinci Woodwork within 90 days on substantially the same project, the full design-package fee is credited toward your contracted work.
- Signed drawings and the deposit. You sign the drawings and pay the deposit, and we order the materials. After the signature, a change goes on a written change order.
- Building in our shop. We build the cabinets in Spring Grove: boxes, doors, drawers and the finish.
- The room gets ready. Before the cabinets arrive, the old kitchen comes out and the room is made ready: clear access, the walls repaired, blocking in the walls where cabinets hang, and the plumbing and electrical rough-ins done. On a remodel we run, that work is on the same schedule as the cabinets.
- Delivery and install. We deliver the finished cabinets and install them.
- Countertops, trim and the finish work. Stone countertops are usually measured on the installed cabinets, then made and set. The trim goes on: crown, panels, filler and the light rail under the wall cabinets. Painting or wall repair around the trim is done when your quote lists it. Then the plumbing and electrical are finished, and the kitchen is yours.
After the install, our workmanship is covered by a written 1-year warranty from the install date.
How long does a kitchen remodel take?
The cabinets take roughly 6 to 8 weeks in our shop from signed drawings for an average kitchen, and installing them usually takes 1 to 3 days. Those 1 to 3 days cover setting the cabinets of a full kitchen: the boxes, the doors and drawers, the island and the panels. They are not the whole remodel.
The whole remodel takes longer, and how much longer depends on the scope. Taking out the old kitchen, moving plumbing or wiring, the countertops after the cabinets are in, the backsplash and the trim all add days, and a village permit can add time before the work starts. Keeping the layout is the shortest route. Moving the sink, the range or a wall is the longest.
You get a schedule made for your job. It comes with the signed drawings and includes the delivery window for the cabinets.
What should you decide first in a kitchen remodel?
Decide the layout first. Almost everything else in the drawings follows from it.
Keep the layout, or change it
If the sink, the range and the refrigerator stay where they are, the new kitchen can follow the old footprint, and the remodel stays simpler. Moving one of them means moving the pipes, the gas line or the wiring behind it. Taking out a wall to open the kitchen to the family room is a bigger job again. All of it is possible. It just belongs in the plan from the start, because it changes the drawings, the permit and the schedule.
The cabinet style and the box
European-style frameless cabinets with flat-panel doors are our specialty and the budget-friendly way to a full custom kitchen, in solid colors or wood-look melamine or veneer. We also build framed cabinets with full or partial overlay doors, and inset cabinets, where each door sits flush inside its opening. Choose painted or stained wood, or melamine. We can match any color. How we build cabinets compares them side by side.
The island
An island can hold drawers, a sink, a cooktop or seating. Each one changes what goes under the floor: a sink in the island means a drain and water there, and a cooktop means power or gas. Leave room to walk and open the dishwasher on every side.
The pantry
A wall of full-height pantry cabinets beside the refrigerator holds a lot, and a butler's pantry between the kitchen and the dining room adds a second work area. A remodel is the time to find the space for one. See custom pantries and butler's pantries.
The appliances
Choose the appliances before the drawings are signed. Send us the model numbers you confirm, and we size every opening to those models: the refrigerator, the range or cooktop, the wall ovens, the dishwasher and any panel-ready doors. A change of model after the build starts can change a cabinet.
Storage inside
Plan the inside of the cabinets around what you store: a pull-out trash next to the sink, deep drawers for pots, roll-out trays, a corner drawer, a cutlery drawer near the dishwasher. Drawer boxes are dovetailed maple, or Blum drawer boxes if you prefer. Salice full-extension drawer slides let each drawer open all the way.
Trim and lighting
The trim finishes the kitchen: crown to the ceiling, panels on the island ends and around the appliances. For under-cabinet lights, we build the lip under the wall cabinets that hides the fixtures and drill the holes for the wires, so plan the lights before the drawings are signed.
What drives the price of a kitchen remodel?
Four things move the price of a kitchen remodel most:
- The cabinets. How many, how tall, and the materials and finish. The cabinets are usually the biggest line, and custom kitchen cabinets explains what moves their price.
- The style of cabinet. Frameless flat-panel is the budget-friendly route; framed and inset cost more to build and fit.
- How complex the design is. Panel-ready appliances, an island with finished ends, and walls that are out of square all add fitting time.
- How much of the room changes. New cabinets in the old layout cost less than a kitchen where the sink, the range or a wall moves. If we run the whole remodel, the other work on the schedule is part of the price too.
Send us photos of your room, the style and finish you have in mind, and your list of ideas: the must-haves and the nice-to-haves, like a cutlery drawer or a pull-out trash next to the sink. With that, we can give you a ballpark range before we visit.
After the free visit, you get a written estimate, and the final price comes with the drawings. Delivery and installation are their own line on the quote.
Do you need a permit for a kitchen remodel?
Rules differ by village. We pull the permit when one is required and confirm it at the visit.
A remodel that moves plumbing, gas or wiring, or takes out a wall, is the kind of work village permit rules are written for. Some villages also list cabinet work: Western Springs' permit sheet names kitchen cabinet and countertop replacement, and Wilmette lists cabinet work as permit work too. Each of our town pages quotes its own village's rules and links to them, for example Western Springs and Wilmette.
What is it like to live through a kitchen remodel?
Most people stay in the house during a kitchen remodel. Plan for some weeks without a working kitchen, and set up a few things first.
- A temporary kitchen. A table in another room with the microwave, a toaster oven or air fryer, a kettle or coffee maker, and the refrigerator if it can move.
- Dishes. Paper plates help, and a laundry or bathroom sink does the rest.
- Pack early. Empty the old cabinets a few days before they come out, and label the boxes by what you will need first.
- Dust and noise. Taking out the old kitchen and cutting are the loud, dusty days. Close the doors to the rest of the house, and plan the day for pets and small children.
- The gap after the cabinets. The countertops come after the cabinets are in, so there are some days with cabinets and no counters. Ask for the dates once the cabinets are set.
- Holidays and guests. If a date matters, such as a holiday dinner, say so at the visit, and plan the remodel around it rather than toward it.
Kitchens we have built
Every kitchen on our site was built in our shop and installed by us.




Where do we remodel kitchens?
From our shop in Spring Grove we remodel kitchens across all five counties: McHenry, Lake, Kane, DuPage and Cook. These are kitchens we have built, county by county.
- McHenry County: a kitchen and a basement bar in Spring Grove, a white shaker kitchen in a newer subdivision in McHenry, and a stained kitchen in Johnsburg.
- Lake County: in Highland Park we did a big remodel: the kitchen, the bathrooms, an office, and walk-in closets. A white kitchen with glass-front uppers in an older ranch in Hawthorn Woods; a couple of kitchens in Deerfield; a kitchen, a full stair rebuild and wainscoting in Lake Forest; and kitchens in Barrington and Long Grove.
- Kane County: a flat-panel, European-style kitchen in Geneva and a modern flat-panel kitchen in Campton Hills.
- DuPage County: two European-style kitchens in Elmhurst, and a European-style kitchen and a traditional kitchen in Naperville.
- Cook County: a whole house in Western Springs, from the kitchen and butler's pantry to the vanity in every bathroom; two kitchens in Glencoe; a white shaker range wall in Park Ridge; and kitchens in Wilmette, Schaumburg and Evanston.
Searching for kitchen remodeling near you? If your town is in one of these five counties, we come to you. All the towns we serve
Who do we remodel kitchens for?
Homeowners, general contractors, interior designers, developers and architects.
General contractors, builders and developers send a bid inquiry, and we price from their drawings and specs as given. We build in our shop, then deliver; their crew installs, or we do. See working with general contractors.
Family owned. Insured and licensed where required. A written one-year workmanship warranty from the install date, for the cabinets and the trim; hardware carries its maker's own warranty. Every cabinet door is made in our shop, and we install the cabinets ourselves or hand them to your contractor's crew. Opened in 2022, backed by more than 30 years of building and installing cabinets.
Blum soft-close hinges close every door quietly. The finish is Renner, an Italian high-end coating.
Questions about kitchen remodeling
How much does a kitchen remodel cost?
It depends on the cabinet count, the materials and finish, how complex the design is, and how much of the room changes. New cabinets in the old layout and a kitchen where the sink and a wall move are different projects. A written estimate follows the free visit, and the drawings give you the final price.
How long does a kitchen remodel take?
The cabinets take roughly 6 to 8 weeks from signed drawings for an average kitchen, and setting them usually takes 1 to 3 days. The whole remodel takes longer, depending on what changes in the room. With the signed drawings we give you a schedule for your project.
Do I need a general contractor for a kitchen remodel?
Not always. If the layout stays and only the cabinets change, we can work with you directly. If the room itself is changing, we can be your general contractor, or work with the contractor you already have.
Do I need a permit for a kitchen remodel?
Rules differ by village. We pull the permit when one is required and confirm it at the visit. Each of our town pages quotes its own village's rules.
What order does a kitchen remodel happen in?
Design and drawings first, then the cabinets are built while the old kitchen comes out and the room is made ready. Then the cabinets go in, the countertops are measured and set, and the trim, the backsplash and the finish work come last.
Can I live in the house during a kitchen remodel?
Yes, most people do. Set up a temporary kitchen in another room and plan for the dusty days when the old kitchen comes out.
Is it cheaper to keep the same layout?
Yes. Keeping the sink, the range and the refrigerator where they are leaves the pipes, the gas line and the wiring where they are. Moving them is possible, and it adds work and time, and it can bring a permit, depending on your village.
Do you take out the old kitchen?
Yes, when your quote lists it. It is optional, so you can do it yourself or have your contractor do it.
Should I renovate the kitchen or just replace the cabinets?
If the layout works and the room just looks tired, new cabinets in the same footprint may be all you need. If the kitchen is too small, too closed off or the work triangle fights you, a remodel that changes the layout is worth pricing. We look at your room at the visit and tell you what we think.
Is your work covered by a warranty?
Yes. Our workmanship on the cabinets and the trim (fit, joinery and finish) has a written 1-year warranty from the install date. Hardware carries its maker's own warranty.
Planning the cabinets?
The cabinets are the biggest part of most kitchen remodels. Custom kitchen cabinets covers frameless, framed and inset cabinets, what goes into them and the kitchens we have built. If the house has more than one room in the plan, see built-ins, pantries, vanities and finish carpentry.
Tell us about your kitchen
Homeowners: tell us what you want to change in the room, and send photos if you have them.
General contractors, interior designers, developers and architects: send the drawings and a bid date.
Schedule your free visit and consultation.
Or call (847) 461-3444.