From visit to install
From the first visit to installation:
how a custom cabinet project works
These are the steps after you send the form, with the time each one usually takes. They apply to kitchens, built-ins, closets and vanities. If you already have drawings from your designer, architect or contractor, we price from your drawings as given.
The steps at a glance
- You send the form or call. We reply within one business day.
- The visit. We measure the room, hear what you want and answer your questions.
- Your estimate. A written estimate follows the visit.
- The design package, if the estimate fits your plans: drawings and the final price.
- You sign the drawings and pay the deposit.
- We build it in our Spring Grove shop: roughly 6 to 8 weeks from signed drawings for an average kitchen.
- Delivery.
- Installation: usually 1 to 3 days for a full kitchen.
- The warranty: a written 1-year workmanship warranty from the install date.
Step 1. What happens after I send the form?
We reply within one business day to set up a visit. Your answers on the form tell us what you have in mind, so the first conversation starts from your project. Photos of the room are welcome; they help us see what we are walking into.
Step 2. What happens at the first visit?
Bring your ideas and photos to the first visit. We measure the room, hear what you want from it and answer your questions. A written estimate follows. If it fits your plans, we draw it with you until it's right, and only then do we build.
Your first visit and consultation are free. We come to your house, look at the room, take our own measurements and talk through what you want: the style, the color or stain, the hardware, the features that matter to you, like a pull-out trash next to the sink. After the visit, we work through the numbers and send you a written estimate at no charge. The final price comes from the drawings.
Step 3. What does the design package include?
If the estimate works for you, the design package covers the detailed measuring and drawings and ends with the final price. It is paid, in one payment, before the drawings start, and it counts toward your deposit.
It includes:
- a review of your goals, photos, inspiration and any plans you have;
- detailed field measurements;
- layout and design discussion, and one main layout direction;
- drawings for your approval: a 2D layout, 3D renderings, or both;
- the cabinet, material and finish direction;
- a written scope;
- one major revision;
- the final price.
Anything more, such as a second design or extra revisions, is agreed and priced in writing before we start. Production shop drawings come with the build itself.
If you move forward with Da Vinci Woodwork within 90 days on substantially the same project, the full design-package fee is credited toward your contracted work.
Step 4. When do I sign and pay the deposit?
When you approve the drawings, you sign them and pay the deposit before we order materials. If you took the design package, that payment counts toward the deposit. The deposit brings the total paid to 30 to 50% of the cabinet price: closer to 50% for a new client, closer to 30% for a returning client or one who already paid for a design package.
One major revision is included before you sign. After that, any change goes on a written change order, and the cost may change.
Step 5. How long do custom cabinets take to build?
Roughly 6 to 8 weeks from signed drawings for an average kitchen. Built-ins, closets and millwork usually take 4 to 6 weeks, sometimes less. It varies with the detail, material availability and how busy the shop is. With the signed drawings we give you an estimated delivery window for your project.
We build the cabinets in our own shop in Spring Grove, and they are finished with Renner, an Italian high-end coating. How we build cabinets explains the boxes, doors and hardware.
Step 6. What happens on delivery day?
We deliver the finished cabinets. The rest of the cabinet price is due on delivery, whether or not we install them.
Before delivery, the room needs to be ready: clear access, a protected place for the cabinets, and any wall repairs, blocking, plumbing and electrical rough-ins done. If the site isn't ready, we store the finished work free for two weeks; after that a storage fee applies, agreed in writing.
Step 7. How long does installation take?
Usually 1 to 3 days for a full kitchen, less for a vanity or a single built-in. Installation is quoted separately, as its own line, and is due after it is complete. On larger projects it is paid weekly or biweekly.
Contractors who have their own installers can take delivery only; the quote shows the difference.
Step 8. What if something isn't right after installation?
Our workmanship (fit, joinery and finish) is covered by a written 1-year warranty from the install date, for cabinets, trim and stairs. Hardware carries its maker's own warranty. Send us photos, your project details and when you noticed it, and we will take it from there.
What should I have ready for the visit?
It helps to have:
- a few photos of the room;
- any plans or drawings you have;
- the appliances and sink you are keeping or buying (model numbers if you have them);
- pictures of kitchens or rooms you like;
- an idea of your budget and your timing;
- the name of your contractor or designer, if you have one.
None of it is required. We take our own measurements at the visit. If you want a rough number for your kitchen first, here is how to measure it in linear feet.
Common questions about the process
Do I need a general contractor?
Not always. We work directly with homeowners. For new cabinets in the same layout, usually not. If the room itself is changing, we can run the whole remodel as your general contractor, or work alongside the contractor you already have.
Can you work from my designer's or architect's drawings?
Yes. We price from the drawings as given. If you want us to remeasure, that time is added to the final cost.
How do I pay?
By check or bank transfer. We don't take credit or debit cards.
Do you remove the old cabinets?
We can, as an optional extra, when your quote lists it.
Can you run the whole kitchen remodel, not just the cabinets?
Yes. We can run your whole kitchen remodel as your general contractor, with the countertops, plumbing and electrical on the same schedule as the cabinets. Or we build and install the cabinets while your contractor leads the job. Your written scope lists exactly what we take on.
Do I need a permit?
Rules differ by village. We pull the permit when one is required and confirm it at the visit.